Precision CNC Machining Of Ring Segments & Shrouds for the Gas Turbine Industry

The Ring Segments shown here are components of a gas turbine assembly, the manufacturing of which utilized a variety of precision machining equipment. The parts where machined on a multi-axis creep feed grinder , 5-axis CBN grinder, a horizontal mill, multi-axis fast-hole and sinker EDM, as well as a 5-axis YAG laser.
Hi-Tek Manufacturing designed and built all of the tooling and fixtures for the machining processes. This ability gives us greater control over the manufacturing process. Production time is typically 4-8 weeks after receipt of order and material.
For more information on these precision CNC machining projects, see the table below or contact us directly.
Request for QuoteHighlights of These Precision CNC Machining Processes For Ring Segment & Shroud Products
- Product Description
- These ring segments are part of small and large gas turbine assemblies.
-
- Precision CNC Grinding Capabilities
Applied/Processes -
Primary:
Creep Feed Grind Qualifying Surface, Matefaces, ID & OD
CBN Grind AFT & FWD Surfaces
Sinker EDM Drill Cooling Holes (Round or Shaped)
Fast Hole EDM Drill Cooling Holes (Round or Shaped)
Laser Drill Cooling Holes (Round)
Sinker EDM Seal Slots
Mill Slots & Holes
Laser Weld Covers
Airflow
Secondary:
Electrode Stamping for EDM Hole Drilling
FPI
Deburr
Vapor Degrease & Clean
Part Mark
- Equipment Used to Manufacture Part
-
3, 4, or 5-Axis Creep Feed Grinder
5-Axis CBN Grinder
5-Axis Horizontal Mill
6-Axis Fast-Hole EDM
3, 4, or 5-Axis Plunge/Sinker EDM
5-Axis YAG Laser
Hi-Tek designed and built Tooling & Fixtures for all processes
- Material Used
- High Temperature Super Alloys
- In process testing/inspection performed
-
Airflow Testing
CNC Optical Inspection
Radiographic Inspection (X-Ray)
Fluorescent Penetrant Inspection (FPI)
Coordinate Measuring Machine (CMM)
Hard Gaging
- Industry for Use
- Aircraft Turbines - Commercial & Military
Small Land Based Turbines - 1MW - 49 MW
Large Land Based Turbines - 50MW to > than 250MW
- Volume
- Over 500,000 processed and shipped since 1980
- Delivery/Turnaround Time
- Product ships in Engine sets - depending on set size and workscope: 4-8 weeks after receipt of order and material.
- Delivery Location
- FOB origin
- Standards Met
-
ISO 9001:2008
AS 9100 Rev C
NADCAP:
AC7116 Non-conventional Machining
AC7114 Non Destructive Testing
Customer Supplied Design & Prints:
Drawing Formats - Unigraphics (PRT), STEP, IGES
View Other Products